West 11th Street between Bleecker and West 4th Street
Greenwich Village Historic District
LPC Designation Report: Available as PDF.
Application is to alter the rear façade, including replacing doors and windows; install new painted wood panels at 2nd floor and bluestone finish at ground and basement floors, and repair or replace brick walls at upper floors to match existing.
PDF presentation links:
Community Board Presentation of 11/14/2024
LPC Presentation (pending–typically posted on the Thursday prior to the hearing date)
UPCOMING HEARING/MEETING(S):
LPC Public Hearing – TBD
**All information and timings are subject to change. Items can sometimes be postponed (laid over) for a future date. Check back here or sign up to receive notifications for this project.
PAST HEARING/MEETING DATES and DECISIONS
Community Board 2 Meeting – November 14th, 2024
CB Resolution Recommends:
A. Approval of the restoration and modification of the third and fourth floor provided that the door is a faithful extension of the window that it replaces including the moulding, and is of equal width to the other windows on those floors; and
B. Approval of the basement and parlor floor windows; and
C. Denial of the second floor windows and that they be modified to be more in keeping with the horizontal plane of the parlor floor with four evenly spaced punched windows spanning the width; and;
D. Approval of the panel cladding of the extension; and
E. Denial of the glossy black paint for the large expanse of the the panel area and in particular for its obscuring the articulation of the panel cladding.
Please note: At this time, all LPC public hearings and meetings are hybrid. Members of the public may participate in-person at the Municipal Building (1 Centre Street, 9th Floor Public Hearing Room), or virtually via Zoom and YouTube. For a video tutorial on how to participate virtually, click HERE.
View the video after a LPC hearing concludes: Videos of past LPC Hearings and Meetings can be found on their YouTube page. The LPC posts these videos about a week after the presentation. Videos include the applicant’s presentation, public testimony (for hearings only), and deliberation by the LPC commissioners.
STAY UPDATED! Click HERE to receive Village Preservation’s email updates about this application.