West 11th Street between Bleecker Street and West 4th Street
Greenwich Village Historic District

LPC Designation Report: Available as PDF.

Application is to alter the front façade and areaway, enlarge a studio window, create a window opening, modify the existing rooftop addition, and construct a rear yard addition.

PDF Presentation Links:
LPC Presentation of 10/28/2025
Community Board Presentation of 10/16/2025

UPCOMING HEARING/MEETING(S):

LPC Public Meeting – TBD

**All information and timings are subject to change. Items can sometimes be postponed (laid over) for a future date. Check back here or sign up to receive notifications for this project.

PAST HEARING/MEETING DATES and DECISIONS

LPC Public Hearing – October 28th, 2025
NO ACTION: Most commissioners were fine with the proposed front facade and rooftop alterations, though there were some comments suggesting that the applicants adjust the height of the parlor windows, and reduce the amount of glazing at the studio window. Opinions regarding the rear alterations were mixed. Some commissioners were fine with the proposal, while others expressed that at least some of the historic rear facade should be retained. The overall consensus was that an extension of some sort is probably appropriate, but there weren’t enough votes in favor of fully demolishing the rear facade to reach a majority.

Community Board 2 Meeting – October 16th, 2025
CB Resolution Recommends:
A. Approval of the reconfiguration of the front facade windows, the areaway, and the iron work; and
B. Denial of the entrance unless it includes framing in a historic design for the door; and
C. Approval of the design for the windows at the rear facade; and
D. Approval of the lot line windows and the flue extensions; and
E. Approval of the penthouse with the suggestion that the studio window be smaller and the height of
the front wall be increased to minimize the visibility of the railing; and
F. That there is clarification as to the regulations concerning the use of the private garden area to
extend the rear facade, that there is dialogue between the applicant and the association members, and
that, in any case, strong consideration be given to reducing the depth of the ground floor extension in
order to conform to the customary use of this area in other houses in the association.


Please note: At this time, all LPC public hearings and meetings are hybrid. Members of the public may participate in-person at the LPC Hearing Room, 253 Broadway, Second Floor, or virtually via Zoom and YouTube. For a video tutorial on how to participate virtually, click HERE.

View the video after a LPC hearing concludes: Videos of past LPC Hearings and Meetings can be found on their YouTube page. The LPC posts these videos about a week after the presentation. Videos include the applicant’s presentation, public testimony (for hearings only), and deliberation by the LPC commissioners.

STAY UPDATED! Click HERE to receive Village Preservation’s email updates about this application